What Butte County itself runs: 2 landfills, sites and programs covering 11 items. If your town doesn’t have its own page, these are usually the places to start.
Checked October 26, 2026 · Call before you go · How we check
Neal Road Recycling and Waste Facility (Butte County)
County landfill and recycling facility at 1023 Neal Road, Paradise, CA 95969, open daily 7 a.m.–4 p.m.; 530-345-4917. Cash, local checks and credit cards (no debit). Gate fees effective July 1, 2026: residential mattresses and box springs $0, TVs and small e-waste $0, appliances $6, Freon units $15, tires from $4.
The facility is free to all Butte County households, who must show a garbage or utility bill as proof of residency. Checked October 26, 2026.
The facility at the Chico Airport Industrial Park is open Fridays 9 a.m.–1 p.m. and Saturdays 9 a.m.–4 p.m., no appointment required. Checked October 26, 2026.
Do not transport more than 5 gallons or 50 lbs of material at one time. Checked October 26, 2026.
PaintCare lists Butte County HHWCF at 1101 Marauder St, Chico 95965 as a paint drop-off site (HHW and VSQG Businesses in Butte County). Checked October 26, 2026.
The Neal Road Recycling and Waste Facility is open to the public at 1023 Neal Road, Paradise, CA 95969, Monday–Sunday 7 a.m.–4 p.m. Checked October 26, 2026.
Appliances (washers, dryers, stoves, water heaters, dishwashers) are $6.00 each; Freon-containing units such as refrigerators are $15.00 ($30 per item after two). Checked October 26, 2026.
Residential mattresses and box springs are $0.00; commercial ones are $9.00 each. Checked October 26, 2026.
Televisions, computer monitors and small e-waste up to 24" (VCRs, microwaves, stereos) are $0.00; larger electronics are $0.24 per pound. Checked October 26, 2026.
Tires up to 36" are $4.00 each, 36–48" $8.00, 48–60" $13.00; rims double the fee; limit 9 tires per vehicle without a manifest. Checked October 26, 2026.
Scrap metal is $3.50 per ton; the minimum charge for garbage is $14.00 per load. Checked October 26, 2026.
The Neal Road gate fees are effective July 1, 2026. Checked October 26, 2026.
“Checked” means we read the official page on that date. Things can change, so call before you go.